 |
Installation or other protection not to interfere with its operation, testing or maintenance |
 |
Drainage from vent port should be readily visible but not as a hazard or nuisance. |
 |
In the horizontal plane, vent is to point downwards with 300mm minimum clearance from ground to vent. |
 |
Line strainers to be fitted immediately upstream. |
 |
Approved resilient seated isolation valves shall be installed immediatly upstream and downstream of the device |
 |
To be installed at least 300mm above the highest downstream outlet |
 |
Not to be subject to flooding or freezing temperatures. |
PERFORMANCE

|